TRANSPORT: Reconfiguration of the crossroads at Howell Center

0

The Collectivity wishes to redevelop the crossroads located at the corners of rue de Hollande, the Howell Center shopping center and rue Hameau du Pont à Marigot; the objective is to clarify the flows at this level.

Work will be launched in the coming weeks to reconfigure these intersections, recalibrate the roadways and sidewalks. There are also plans to completely redo the coverings and to replace and strengthen the storm drainage network.

The civil engineering buried for the passage of the cables strong current and weak current will also be carried out. Finally, it is planned to plant green spaces.

The call for tenders to choose the company has just been launched. (Source: www.soualigapost.com)

 7,108 total views

About author

No comments

%d bloggers like this page: