...

Sonesta at Maho 

0

The time of its reconstruction reduced by 30% thanks to prefabricated. The establishment in Maho must reopen on February 1, 2019.

“It was imperative to rebuild incorporating the best materials and the latest storm-resistant technology,” said Saro Spadaro, Chairman and CEO of the Maho Group of the rebuilding of his establishment in Maho. “We also chose these materials because they reduce construction time by 30% compared to traditional building materials and we understand the importance of helping St. Maarten return as soon as possible,” he adds. The group has bet on technology and materials TCK and LVKE, a consortium of so-called green technologies based in China, which, according to Saro Spadaro, is "at the forefront of modernization of the construction sector". The Chinese group TCK Green Building explains how to build collective buildings in prefabricated materials of sustainable quality, with metallic steel structures offering maximum thermal and sound insulation. (More details on www.soualigapost.com)

 8,447 total views

About author

No comments

%d bloggers like this page: